How long between coats of Bona Decking Oil?
0.5-1.0 h
Recoat time for Bona Decking Oil is 0.5-1.0 h under standard lab conditions (typically 20 C / 60 percent RH). 30-60 min between coats (per range brochure)
Recoat times lengthen in cold or humid conditions; screeding between coats (e.g. P150 or finer) is normally specified to ensure intercoat adhesion.
Sources
- PDF Bona Oil Decking Systems Range Broch · p.2