product-spec drifast-sealer application.recoat_time_hours

How long between coats of Bona DriFast Sealer?

1.5-2 h

Recoat time for Bona DriFast Sealer is 1.5-2 h under standard lab conditions (typically 20 C / 60 percent RH). Ready for sanding / coating at 20 C / 60% R.H.

Recoat times lengthen in cold or humid conditions; screeding between coats (e.g. P150 or finer) is normally specified to ensure intercoat adhesion.

Sources