product-spec drifast-stain application.recoat_time_hours

How long between coats of Bona DriFast Stain?

2-18 h

Recoat time for Bona DriFast Stain is 2-18 h under standard lab conditions (typically 20 C / 60 percent RH). approx 2 h standard, White 6 h, Ebony/Spice Brown/Cocoa 12-18 h

Recoat times lengthen in cold or humid conditions; screeding between coats (e.g. P150 or finer) is normally specified to ensure intercoat adhesion.

Sources