How long between coats of Bona Mega ONE?
1-2 h
Recoat time for Bona Mega ONE is 1-2 h under standard lab conditions (typically 20 C / 60 percent RH).
Recoat times lengthen in cold or humid conditions; screeding between coats (e.g. P150 or finer) is normally specified to ensure intercoat adhesion.
Sources
- PDF Bona Mega ONE Technical Data Sheet · p.1