product-spec wave-2k application.recoat_time_hours

How long between coats of Bona Wave 2K?

2-3 h

Recoat time for Bona Wave 2K is 2-3 h under standard lab conditions (typically 20 C / 60 percent RH).

Recoat times lengthen in cold or humid conditions; screeding between coats (e.g. P150 or finer) is normally specified to ensure intercoat adhesion.

Sources